Before reading this article, ensure you have read Measurement - parts & labour and Using formula within Groundplan articles to aid in understanding the following formula examples.
📝The formula values provided in this article are for example purposes only.
Term | Explained |
| total counts |
| total metres measured |
| total square metres measured |
| total count/length/area divided by an amount |
| total count/length/area multiplied by an amount |
| rounding up a decimal value to the next whole number |
Double GPO (double power outlet)
Example parts for a double GPO (double power outlet) count measurement:
Part | Explanation | Formula | UoM |
Double GPO |
|
| each |
Wall bracket | Allowing for a |
| each |
2.5mm twin and earth | How many |
| m |
2.5mm twin and earth (100m cable drum) | How many |
| drum |
2.5 cable clips | How many clips are needed when |
| jar |
LABOUR |
|
|
|
Labour | Allowing for |
| hours |
Mains Cable Run
Example parts for a mains cable run length measurement:
⚠️Warning: This example does NOT use the height component in the measurement unit section:
Part | Explanation | Formula | UoM |
Mains cable runs | How many metres are required |
| m |
50mm HD conduit (orange rigid 4m) | How many |
| lengths |
16mm XLPE Four Core | How many |
| m |
16mm SDI red cable (S/D insulated) | How many total metres measured multipled by |
| m |
16mm SDI black cable (S/D insulated) | How many |
| m |
Warning tape underground orange (100m) | How many |
| rolls |
50mm sweeping bend (90° heavy duty orange) |
|
| each |
LABOUR |
|
|
|
Labour | Allowing for |
| hours |
Airconditioning / Heat pump
Example parts for a 2.7m height ceiling airconditioning area measurement. This formula is based on an m² calculation.
⚠️Warning: This example does NOT use the height component in the measurement unit section:
Part | Explanation | Formula | UoM |
Room areas | How many |
| m² |
KW rating | Area measured multiplied by |
| KW |
Volume of air | The area measured multiplied by |
| m³ |
View individual KW ratings quantities when exporting
To show individual area KW ratings, lock the breakdown to display on export. It is recommended to rename the areas within the stage to display the location.
From the quantities tab, click + on the part / labour line with the breakdown
Click + next to
KW Ratingand click the padlockClick export and select export as CSV
Choose the export format
View the breakdown in the notes column or for group by measurement, the breakdown will appear in the description column
Click download export
For formula assistance, please reach out to Support. Go to: Help > Send us a Message.
💻Accessed free training?
Arrange your free training by clicking Help > Send us a Message. Our trainers are ready to help with:
Streamlining workflows
Time-saving strategies
Maximising your subscription
Alternatively, visit the Groundplan Academy here for self-directed courses.





