Plumbing Formula
  • 19 Sep 2023
  • 2 Minutes to read
  • Dark
    Light
  • PDF

Plumbing Formula

  • Dark
    Light
  • PDF

Article summary

Before reading this article, ensure you have read Measurement - Parts & Labour and Using Formula within Groundplan articles to aid in understanding the following Formula examples.

📝 The Formula values provided in this article are for example purposes only.

TermExplained
counttotal counts
lentotal metres measured
count or len / xtotal count/length divided by an amount
count or len * xtotal count/length multiplied by an amount
ceil(x)rounding up a decimal value to the next whole number


Downpipe

Example Parts for a downpipe Count Measurement:

plumbing-downpipes.png

PartExplanationFormulaUMO
100mm DVW pipe (6m)How many 6m lengths are required to complete downpipes when 3 metres 1/2 length (3m) is needed for each downpipecount*0.5lengths
100mm PVC 90° bendHow many 90° bends are required when 3 are needed for each downpipecount*3each
100mm saddle clipHow many saddle clips are required when 3 are needed for each downpipecount*3each
100mm classic expansion outletHow many expansion outles are required for each downpipecounteach
Downpipe nozzleHow many nozzles are required for each downpipecounteach
(optional) 100mm junction (for 80%)How many junctions required for 80% of the downpipes neededceil(count*0.80)each


100mm DWV Sewer (av. 1.5m depth)

Example Parts for a 100mm DWV average 1.5m depth Length Measurement:

plumbing-sewer.png

PartExplanationFormulaUMO
100mm DWVHow many 6m lengths required for the total length measuredceil(len/6)lengths
Trench work (1.5m average depth)How many m3 for the total length measured multiplied by the 600mm wide by 1.5m deeplen*0.6*1.5m3
Crushed rock (400mm average depth)How many m3 for the total length measured multiplied by the 600mm wide by 400mm deeplen*0.6*0.4m3


Sewer Bend

Example Parts for a sewer bend Count Measurement:

plumbing-bends.png

PartExplanationFormulaUMO
100mm 45° bendRequire 2x 45° bends for each 90° countcount*2each
100mm DWVAllowing an additional 600mm of 100mm DWV for each upwards pipe (Grouping with Sewer Measurement) divided by 6m lengths required for the total length measuredceil(len*0.6/6)lengths


For Formula assistance, please reach out to Support. Go to: Help > Send us a Message.

Download a PDF copy of Using Formulas within Groundplan here.



💡Accessed your Company's free 1 hour Training Session?

Organise your session today! Click Help > Send us a Message and ask to book in for free training.

Trainers can assist with:

  • Workflow solutions
  • Time-saving tips
  • Making sure you're getting the most out of your subscription

If you've accessed your free training and need further Support, reach out to book a 1 or 2 hour paid session.


Was this article helpful?